Updated

Supreme Boulevard Tower C — 3 BHK — Chembur — Mumbai

Supreme Boulevard Tower C

Special Offer
Limited-Period Offer Available
Speak to our sales team for the current offer on this project.

Project snapshot

City
Locality
Configurations
3 BHK
Possession
October 2031
Status
New Launch
RERA
PR1182022602663
as on 28 Nov 2026
Project Scorecard by Synergy Infracon
4.1 / 5
Location
★★★★★ 4.2
Construction Quality
★★★⯨★ 3.8
Amenities
★★★★⯨ 4.5
Value for Money
★★★⯨★ 3.8
Builder Reputation
★★★★★ 4.0

Supreme Boulevard Tower C is a New Launch residential tower by Supreme Universal on Deonar Village Road in Chembur East, Mumbai (PIN 400088). It offers three-bedroom (3 BHK) homes of 1,200 sq ft and 1,410 sq ft. The project is registered with MahaRERA under PR1182022602663, with a proposed completion date of October 2031. Facts as on 27 Nov 2026, from RERA / the developer.

Overview & Positioning

Tower C is the newest phase of Supreme Boulevard, a gated community on five acres of freehold land in Deonar. The developer describes it as its fourth residential project in Chembur, and the wider site carries about 50,000 sq ft of lifestyle amenities. The tower is planned around three-bedroom homes only, so it suits families who want room for a home office, guests or growing children without moving to a larger suburb.

Tower C is still in its early booking phase. The RERA registration is dated 6 November 2026, and the launch was announced in late November 2026. Buyers who want a three-bedroom home in an established Chembur neighbourhood, with a large open site and a full clubhouse, will find the proposition clear. Buyers who need a ready home or a quick move-in should look elsewhere. Against the wider Chembur market, where the average property rate is about ₹34,300 per sq ft as of November 2026, Supreme Boulevard sits in the premium-but-established band rather than the ultra-luxury one.

Location & Connectivity

The site sits on Deonar Village Road in Deonar, Chembur East. It is one of the few large plots in this part of Chembur that still offers a landscaped, low-density setting, although the road access is shared with heavier local traffic. The table below shows the main travel times as reported for the locality.

DestinationDrive Time
Govandi Railway StationAbout 5 minutes
Eastern FreewayAbout 12 minutes
Bandra-Kurla Complex (BKC), via SCLRAbout 20 minutes
South Mumbai, via Eastern FreewayAbout 25 minutes under normal conditions

The Eastern Freeway, a 16.8 km corridor, links the Eastern Express Highway at Chembur to South Mumbai. Rail access comes from Govandi and Chembur stations on the Harbour Line, and Metro Line 2B already runs from Mandale to Chembur with six stations. The airport at Santacruz is reached through the SCLR and the Eastern Express Highway, and Navi Mumbai International Airport is reachable via the Sion-Panvel Highway. Peak-hour traffic on the Eastern Express Highway and the Chembur junctions can add considerable time, so a site visit at the hour you will actually commute is worth doing.

Location Map
Location Map — available on request
Get the exact location, connectivity and nearby landmarks from our sales team.

Upcoming Infrastructure

  • Metro Line 2B (DN Nagar to Mandale, 23.64 km): the Mandale to Chembur section is open, and the Chembur to DN Nagar section is under construction, with officials expecting the full corridor to run in 2026-27. It will link Metro Lines 1, 2A, 3 and 4 and the Western and Eastern Railway networks.
  • Mumbai Monorail relaunch (Chembur to Wadala to Jacob Circle): preparations are in the final stages, with no official launch date yet. For owners here, a working monorail would add a second north-south link beside the Harbour Line.
  • Metro Line 4 (Wadala to Kasarvadavali): Phase 1 is targeted for December 2026, improving access toward the eastern suburbs and Thane belt.
  • Eastern Freeway sections: some sections are due to be completed later, which will ease the drive into South Mumbai for residents.

Configurations & Pricing

Tower C is planned as three-bedroom homes in two sizes, 1,200 sq ft and 1,410 sq ft. The table lists the areas as filed for the tower.

ConfigurationArea (sq ft)
3 BHK1,200
3 BHK1,410

The developer's project-level price list covers the wider Supreme Boulevard site rather than Tower C alone. On that list, 2 BHK homes start from ₹3.05 Cr, 3 BHK homes from ₹3.99 Cr and 4 BHK homes from ₹7.25 Cr, each marked "++" and subject to terms and conditions. The developer also states that the 2 BHK apartments across the overall project are sold out. Buyers should treat the Tower C figure as a separate quotation and ask for it in writing.

For context, Chembur's average property rate was about ₹34,300 per sq ft in November 2026, and new-launch projects in the locality average about ₹32,250 per sq ft. Any Tower C quote should be read against those figures, along with the floor, parking and specification it includes.

⚠️ Price Disclaimer: Prices shown are indicative and compiled by Synergy Infracon from developer and market sources. Actual cost may vary based on floor rise, PLC (Preferential Location Charge), parking, GST, registration and developer-specific charges. Contact our team for the latest verified cost sheet.
Pricing on request — get the current, verified price details from our sales team.
Master / Floor Plan
Master / Floor Plan — available on request
Get the master plan, floor plans and unit layouts from our sales team.

Launch & Possession Timeline

  • August 2024: the wider Supreme Boulevard project launched.
  • 6 November 2026: MahaRERA registration PR1182022602663 recorded for the Chembur Wing C filing.
  • 24 November 2026: the launch of Tower C was reported in the trade press.
  • 27 November 2026: the developer announced Tower C as its fourth residential project in Chembur.
  • 6 October 2031: proposed completion date under the RERA filing.

Since the August 2024 launch, the developer reports about 20% appreciation in prices, and it says 80% of the inventory launched in Towers A and B has sold.

Key Highlights & USPs

  • Five acres of freehold land in Deonar, which is uncommon for a residential site in Chembur East.
  • About 50,000 sq ft of lifestyle amenities across the Supreme Boulevard site.
  • A 15,000 sq ft clubhouse with sports courts and banquet facilities.
  • Three-bedroom homes of 1,200 sq ft and 1,410 sq ft, with the tower planned around family-sized layouts.
  • A gated community layout with four towers across the Boulevard site.
  • Access to the Eastern Freeway within about 12 minutes and to Govandi station within about 5 minutes.
  • A RERA-registered project with a proposed completion date of October 2031.

Amenities & Lifestyle

Wellness & Fitness

  • Spa with steam and sauna, and a jacuzzi and plunge pool
  • Swimming pool and gymnasium
  • Yoga studio

Leisure & Social

  • Sports courts and banquet facilities
  • A 15,000 sq ft clubhouse for residents' gatherings
  • Landscaped open spaces and greenery across the site

Convenience & Security

  • Gated community layout with shared facilities for residents

The developer positions the project around openness, wellness and community living. Buyers should confirm which amenities sit inside Tower C and which are shared across the wider site, since the 50,000 sq ft figure covers the whole Boulevard development.

About the Developer

Supreme Universal was founded in 1982 and develops residential projects in Mumbai and Pune. Its joint managing directors are Sunny Bijlani and Vishal Jumani, and the company is privately held, so its finances are not publicly listed. Its Chembur record includes Supreme Signature at Union Park and Supreme Epitome, both completed. Supreme Boulevard Wings A and B on the same site are sold heavily, which gives Tower C a track record to examine. One point to weigh: the possession date for Wing B was extended to 31 March 2029, so buyers should read the RERA dates for each tower closely. Synergy Infracon also covers other Supreme Universal projects in Mumbai and Pune.

Locality & Investment Outlook

Chembur's average property rate was about ₹34,300 per sq ft in November 2026, up about 3.44% year on year. The median asking rate is about ₹36,060 per sq ft, which shows that the locality has a range of older and newer stock. Average rental yield sits around 3.60% as of September 2026, with average rent near ₹103 per sq ft per month. A 2 BHK typically rents for about ₹70,000 to ₹1.25 lakh a month as of July 2026, which indicates steady demand from working professionals who value the Eastern Freeway, the SCLR and the Harbour Line.

For an owner-occupier, the appeal is space and a quieter setting than most central suburbs. For an investor, the three-bedroom format widens the tenant pool to families and corporate households, though rental yields of this order are modest and capital gains depend on infrastructure timing. Metro Line 2B and the Monorail relaunch could support resale demand over the next few years. Resale liquidity in Chembur is generally good, though new-launch properties may trade at a premium to older stock until the infrastructure is operational.

Home Loans & Charges

ChargeAmount
Stamp duty (Maharashtra), male ownership6%
Stamp duty (Maharashtra), female ownership5%
Stamp duty (Maharashtra), joint ownership5.5%
Registration1% of total value
GST on under-construction residential apartments5%

The Supreme Boulevard Wings A and B have been listed with banks including SBI, ICICI Bank, HDFC Bank, Axis Bank, Kotak Mahindra Bank and Bank of Baroda. Synergy Infracon helps buyers with loan paperwork and can compare offers for a Tower C purchase.

RERA & Approvals

The project is registered with MahaRERA under PR1182022602663 as "Supreme Boulevard Chembur Wing C", a residential project. The registration is dated 6 November 2026, and the proposed completion date is 6 October 2031. The filing records a plot area of 19,864.9 sq m, two towers and 114 units. The launch report for Tower C cites about 131 three-bedroom residences, so buyers should check the unit count against the filing on the MahaRERA portal before committing. Buyers can verify the registration, project details and the status of the project directly on the state RERA portal, and we recommend doing so before any booking.

Why Buy Through Synergy Infracon

Buying through a RERA-registered channel partner gives you the developer's pricing alongside independent advice. Our team checks the cost sheet line by line, including stamp duty, registration, GST and parking, so you see the full figure before you decide. We coordinate site visits at the hours you choose, help with loan paperwork and stay with you after booking through to possession. If you want to compare Tower C with other Chembur options, or need the latest cost sheet, our team will prepare it for you and arrange a visit at your convenience.

FAQ — Frequently Asked Questions

Q: What configurations does Supreme Boulevard Tower C offer?

A: Tower C offers three-bedroom (3 BHK) homes in sizes of 1,200 sq ft and 1,410 sq ft.

Q: Is Supreme Boulevard Tower C RERA registered?

A: Yes, the project is registered with MahaRERA under PR1182022602663, with a registration date of 6 November 2026.

Q: When is possession expected for Tower C?

A: The RERA filing gives a proposed completion date of 6 October 2031.

Q: How far is Supreme Boulevard Tower C from the Eastern Freeway and BKC?

A: The Eastern Freeway is about 12 minutes away by road, and BKC is about 20 minutes via the SCLR.

Q: Which metro and rail links serve Chembur?

A: Metro Line 2B runs from Mandale to Chembur, and Govandi and Chembur stations on the Harbour Line serve the area.

Q: Is Supreme Boulevard Tower C a good investment?

A: Chembur's rental yield sits near 3.60%, and the three-bedroom format attracts family and corporate tenants, though returns depend on future infrastructure timing.

Get pricing, plans, and a personal walkthrough — talk to our sales team.

Related News

Related Projects

Latest news on Supreme Boulevard Tower C

Express Your Interest

Share your details

Thank you! Our sales team will get in touch with you shortly.