Zuari Gangothri Tribhuja, a high-rise residential project in Kollur, West Hyderabad, was formally launched in September 2026. The project is being developed by Gangothri Infra Edge Pvt. Ltd. together with Zuari Infraworld India Limited, the real estate arm of the Adventz brand. It offers 3 BHK and 4 BHK apartments, with the base price for 3 BHK homes starting around ₹1.27 crore.

The Story: What Was Launched and When

The launch took place in Hyderabad in September 2026, with coverage in local and business media in the first half of the month. The project spans 9.16 acres and comprises nine towers of G+37 floors each, with 1,730 residences in total. The developers have put the estimated sales value at about ₹3,000 crore. Roughly 72% of the site is kept as open space, and the project has been pre-certified under the IGBC Silver green rating. A sales experience centre and brochure were unveiled at the launch event.

The project is registered with the Telangana State Real Estate Regulatory Authority under RERA number P01100010650/1/2. Construction is at an early stage, with about 10% of work completed as of 9 September 2026. The developer's target possession date is January 2032, while the RERA possession date is May 2032.

Current Pricing and Unit Sizes

As of September 2026, the 3 BHK homes are priced from about ₹1.27 crore, and a 3 BHK unit of 2,314 sq ft is listed at around ₹1.73 crore. A 4 BHK unit of 3,125 sq ft is listed at about ₹2.34 crore. The base rate is around ₹7,499 per sq ft, and this excludes charges for amenities, parking and infrastructure, so the final cost will be higher than the base figure.

ConfigurationBuilt-up areaCarpet area
3 BHK1,679 to 2,314 sq ft1,175 to 1,619 sq ft
4 BHK3,125 to 3,126 sq ft—

The payment plan is construction-linked and has ten stages. The first stage is 5% on booking, followed by 10% at agreement, and further 10% instalments tied to excavation, plinth, slab casting, brickwork and internal finishing. The final stage is 15% on offer of possession. GST at 5% applies to each stage. Estimated monthly maintenance is about ₹6,720 for a 3 BHK home and ₹12,500 for a 4 BHK home, and the final figure will depend on carpet area and floor.

Location, Travel Times and Connectivity

Kollur sits close to the Outer Ring Road, and ORR Exit 2 is about two minutes away by car. HITEC City and the Financial District are roughly 20 to 30 minutes by road, depending on traffic. Nagulapalli railway station is about 4.1 km away, Lingampally MMTS is 12 to 15 km away, and Miyapur metro station, the Red Line terminus, is about 17 to 18 km away. Wipro's Gopanpally campus is 7.7 km away, and Narayana Junior College is 2.8 km away.

What This Means If You Are Buying

The news matters most for buyers who want a ready-to-move home soon, because this project will take several years to reach possession. Buyers who are comfortable with a construction-linked plan and a possession window stretching to 2032 may find the entry price more attractive than in established parts of Hyderabad. However, the nearest metro is still well away, so commuters should plan for road travel or the proposed Raidurg–Kokapet Neopolis metro extension, which is at the detailed project report stage. Rental yields for apartments in Kollur are estimated at 3% to 4% as per current market data, which is modest compared with the capital outlay.

Synergy Infracon's Take

At Synergy Infracon, we read this launch as a sign that developers are willing to build large, low-density towers on the western edge of the city. The 72% open area and corner-heavy layout are real differentiators, and the price per sq ft is competitive for a project of this scale. Our concern is timing. Construction is only at 10%, and the gap between the early-stage price and the eventual possession value is wide. Buyers should weigh the long wait against the quality of the offering. Infrastructure around Kollur is improving, but much of it is still in planning. We would not treat future metro access as a certainty when making a decision today.

What We'd Advise Right Now

  • Compare the all-in cost, including GST, parking, infrastructure charges and maintenance deposits, rather than the base price alone.
  • Ask for the stage-by-stage payment schedule in writing and check when each instalment falls due against your own cash flow.
  • Verify the RERA registration on the Telangana RERA portal using P01100010650/1/2 before paying any booking amount.
  • Visit the site and the sales experience centre, and drive the route to HITEC City at peak hours before deciding.
  • Check home loan eligibility with your bank, since several lenders have approved loans for this project.

Our sales team can arrange a site visit, walk you through the payment plan and help you compare this project with similar options.

Related Projects We Cover

Projects mentioned in this article

Godrej Shamshabad Under Construction

Godrej Shamshabad

by Godrej Properties

Phase 1 (5 towers, ~1,300 units) launched Aug 2025 · Phase 2 (4 towers) planned

Rajendra Nagar, Hyderabad

₹1.10 Cr - ₹3.05 Cr

2 BHK, 3 BHK, 3.5 BHK, 4 BHK

RERA Possession December 2029