Merlin Niyasa
Project snapshot
Updated on
Overview & Positioning
Merlin Niyasa is a residential project under construction in Anandapur, on the East Kolkata side of the EM Bypass. Merlin Projects Limited, part of Merlin Group, is the developer. The site covers about 3.23 acres within the East Kolkata Township corridor, and the layout is two towers of G+28 floors with 152 apartments in total. The configurations run from 3.5 BHK through 4 BHK to 4.5 BHK, so this is a large-format family home rather than a compact flat. The developer describes the homes as three-side open, south-open and Vaastu-compliant, and it markets the project under the line "Abodes Gifted With Peace."
The project suits buyers who want generous space and daylight for a long stay, and who can wait for a 2030 possession. It is a weaker fit for anyone who needs keys within a year, or for buyers who plan mainly to rent out. In its micro-market the project sits in the premium family-apartment band rather than the ultra-luxury tier. Buyers comparing it with established Anandapur and Ruby-side launches should expect a higher entry ticket in return for newer design and larger layouts.
Project Gallery






Location & Connectivity
The project sits at 880, Anandapur Madurdaha, off the EM Bypass near the Ruby crossing. Daily movement here runs mainly along the bypass, which is the main east-west arterial for this part of the city.
| Destination | Distance | Drive Time |
|---|---|---|
| Eastern Metropolitan Bypass | 550 m | 2 min |
| Nearest metro station | 750 m | 3 min |
| Desun Hospital | 450 m | 2 min |
| Ruby General Hospital | 700 m | 3 min |
| Fortis Hospital | 1.3 km | 5 min |
| Ballygunge Junction (railway) | about 6 km | 20 min |
| Salt Lake Sector V (IT hub) | about 12 km | 35 min |
| New Town (business district) | about 16 km | 45 min |
| Netaji Subhas Chandra Bose International Airport | about 22 km | 50 min |
Peak-hour traffic on the EM Bypass and the Ruby stretch can add a lot of time to trips toward the airport and central Kolkata, so test the commute at the hour you will actually travel. Road and infrastructure work in the East Kolkata Township area is ongoing, and some stretches nearby may be partly blocked during site visits. Ask our team for the current access route before you go.
Configurations & Pricing
Current market data puts the project's average rate at about ₹17,540 per sq ft. Each indicative price below is the super built-up area multiplied by that single rate, so the price moves in step with the size of the home.
| Configuration | Super Built-Up (sq.ft.) | Indicative Price (Rs) |
|---|---|---|
| 3.5 BHK | about 1,996 | ₹3.50 Cr |
| 4 BHK | about 2,130 | ₹3.74 Cr |
| 4.5 BHK | about 2,457 | ₹4.31 Cr |
The indicative figures cover the apartment value only. Floor rise, preferential location charge, car parking, GST, stamp duty, registration and developer-specific charges are extra and differ by unit. Ask for a unit-wise cost sheet before you compare any two homes.
Launch & Possession Timeline
- August 2024: Project launched.
- 2024: Project registered under WBRERA (WBRERA/P/KOL/2024/002243).
- 6 December 2025: A district court issued an interim order restraining the developer and a co-party from acting under the joint development agreement and power of attorney linked to the land, until 7 January 2026. These were allegations in a land dispute, not findings of wrongdoing.
- 17 December 2025: Press coverage described the project as a development of roughly ₹600 crore with more than 150 apartments.
- 22 December 2025: The Calcutta High Court noted that a blanket stop on construction would affect end buyers and booked flats, and described the injunction as excessive.
- Current stage: Under construction.
- June 2030: Expected possession, the date most listings carry. A couple of listings show July 2030 or December 2029.
Key Highlights & USPs
- About 3.23 acres of land on the East Kolkata Township corridor, off the EM Bypass.
- Two G+28 towers with 152 apartments in total.
- 386 covered car parking spaces recorded in the RERA filing.
- Three configurations (3.5, 4 and 4.5 BHK) with super built-up areas from about 1,996 to 2,457 sq ft.
- The EM Bypass is about 550 m away and the nearest metro station about 750 m.
- Desun Hospital about 450 m away, Ruby General Hospital about 700 m and Fortis Hospital about 1.3 km.
- Developer-stated three-side open and south-open apartment design.
- Merlin Group reports more than 150 projects delivered, a company-published figure.
Amenities & Lifestyle
The amenities below appear in the project's marketing listings and in the state RERA facility disclosures.
- Wellness & Fitness: Gymnasium.
- Leisure & Social: Clubhouse and swimming pool.
- Convenience & Security: 24x7 water supply, 24x7 security, CCTV, lifts, drinking-water facility, fire-fighting facility, common-area access, electrical design with street lighting, and use of renewable energy.
Before you rely on any single amenity, ask for the sanctioned amenity plan and confirm the size and operating hours of the clubhouse and pool in writing.
Specifications
- Two towers of G+28 floors with 152 apartments.
- 386 covered car parks.
- Lifts serving the towers.
- Fire-fighting facility and drinking-water facility.
- Renewable energy use noted in the RERA filing.
- Apartments described by the developer as air-conditioned, three-side open and south-open.
- Electrical design that includes street lighting.
Flooring, kitchen, bathroom, window and wiring specifications should be checked against the agreement and the sample flat before you book.
About the Developer
Merlin Group has been in business for more than 40 years and was established in 1984. Its company-published figures include more than 150 projects delivered, about 20 million sq ft developed, around 10 million sq ft under construction and a land bank above 500 acres. Its Kolkata portfolio includes Merlin The 1, Merlin Island, Merlin Verve, Merlin Aspire, Merlin Waterfront Howrah, Merlin Regalia and Merlin Legacy.
For Merlin Niyasa, the group's track record is a reasonable starting point. However, the project has no delivery history of its own yet, and it has been caught in a land dispute. Treat the group's scale as a positive, but verify the title and the RERA record independently before you commit.
Locality & Investment Outlook
Anandapur has moved from a largely residential fringe to a more established part of the EM Bypass belt, helped by the proximity of hospitals, schools and the bypass itself. At about ₹17,540 per sq ft on super built-up area, the project is priced in the upper middle range for newer East Kolkata launches. A buyer who wants a larger home with newer specifications will find the premium easy to justify. A buyer who is mainly comparing square footage per rupee should compare carefully with older stock nearby.
For an owner-occupier, the appeal is space, daylight and a 4 to 4.5 BHK layout that suits joint families. For an investor, returns are more modest. Rental yields for large apartments in this part of the city tend to be in the low single digits, and capital growth depends on the bypass corridor's infrastructure keeping pace. Resale liquidity for 4 BHK and larger homes is narrower than for smaller units, and the ongoing land dispute is a factor that resale buyers and lenders will ask about. A realistic two- to three-year view is steady, rather than rapid, appreciation, with the outcome closely tied to how the dispute is resolved and how construction progresses.
RERA & Approvals
Merlin Niyasa is registered with the West Bengal Real Estate Regulatory Authority under the project registration number WBRERA/P/KOL/2024/002243. Buyers can search this number on the WBRERA portal to view the registered project details, the promoter information and the approved layout.
The land is held under a joint development arrangement, and RERA records list Fedrick Merchants and Merlin Projects Limited among the parties. In December 2025, a district court issued an interim order restraining the developer and a co-party from acting under the joint development agreement and power of attorney linked to the land. The High Court later commented on the order's effect on buyers with booked flats. Before you book, have an advocate review the title documents, the joint development agreement and the current status of the case.
Why Buy Through Synergy Infracon
As a RERA-registered channel partner, Synergy Infracon works for the buyer's side of the table. We explain the pricing, share a unit-wise cost sheet and set up site visits at times that suit you. We also help with home-loan paperwork and stay in touch after booking, through agreement signing, construction updates and handover. We do not build or own this project. Our role is to make sure you understand the risks and the numbers before you commit. If you are considering Merlin Niyasa, request the latest cost sheet and a site visit with our team, and we will walk you through the layout options and the open questions that matter most for your decision.
FAQ — Frequently Asked Questions
Q: Is Merlin Niyasa RERA registered?
A: Yes. The project is registered with WBRERA under WBRERA/P/KOL/2024/002243, and buyers can verify it on the West Bengal RERA portal.
Q: When will Merlin Niyasa be handed over?
A: Most listings give June 2030 as the expected possession date, while a couple show July 2030 or December 2029.
Q: What is the price range for Merlin Niyasa?
A: Indicative prices run from about ₹3.50 Cr for a 3.5 BHK to about ₹4.31 Cr for a 4.5 BHK, based on an average rate of about ₹17,540 per sq ft on super built-up area. Parking, PLC, GST and registration are extra.
Q: Which configurations are offered?
A: The project offers 3.5 BHK, 4 BHK and 4.5 BHK apartments, with super built-up areas from about 1,996 to 2,457 sq ft.
Q: What is the nearest metro station and railway station?
A: The nearest metro station is about 750 m away, and the nearest railway station is Ballygunge Junction, about 6 km away.
Q: Is Merlin Niyasa a good investment?
A: It suits buyers who want a large family home for long-term living. For investors, rental yields are modest and the land dispute adds resale risk, so a legal title check is essential.
Q: Is the land dispute a serious concern?
A: Reports describe allegations in a dispute over the joint development arrangement, with interim court orders that were later criticised for being too broad. Have an advocate review the title and the case status before you book.
Q: Does the project have a clubhouse and swimming pool?
A: Marketing listings mention a clubhouse, a gymnasium and a swimming pool, along with 24x7 security and CCTV. Confirm their size and operating hours in writing before you rely on them.
Related News
EMI Calculator — Merlin Niyasa
Estimate your monthly EMI for this project
More projects by Merlin Group
Related Projects
Under Construction
Ambuja Utpalaa
by Ambuja Neotia
Prathama, Dwitiya, Tritiya, Sasthi and Chaturthi launched · Panchami final tower
Anandapur, Kolkata
₹2.79 Cr onwards
3 BHK, 4 BHK, 5 BHK Duplex
Under Construction
Urbana
by Bengal NRI Complex
Phase 1 completed · Phase 2 under construction
Anandapur, Kolkata
₹4.15 Cr - ₹8.30 Cr
3 BHK, 4 BHK
Under Construction
New Launch
Latest news on Merlin Niyasa
News
Merlin Niyasa Gets RERA Nod in Anandapur: What Kolkata Buyers Should Check
Merlin Niyasa Gets WBRERA Registration in Anandapur: What Kolkata Buyers Should Check Now Merlin Group has registered Merlin Niyasa with the West Bengal Real...
News
Merlin Avana Price, Floor Plan and Launch Details, Tollygunge
Merlin Avana is an 11.5-acre, 7-tower premium residential project in Tollygunge, South Kolkata near metro. 2/3/4 BHK flats starting ₹63.5L. Possession Dec...